Promozioni

  • INTERVENTO PLUS: Gestione Completa degli Interventi

    Il modulo “Intervento Plus” è uno strumento rivoluzionario che semplifica e ottimizza la gestione degli interventi, dalla pianificazione alla fatturazione. Pensato per team commerciali e tecnici, offre una suite completa di funzionalità per garantire un monitoraggio trasparente ed efficiente di ogni intervento.

    250,00 €  (500€)
  • Advanced HRM : Advanced human resources management

    This module brings a layer of ergonomics and features missing in the standard Dolibarr human resources management module, such as the facility to create absence requests from the employee schedule, the addition of automatic VAT rates, the integration of the km scale on the tranche 1 and of google maps.

    145,00 €  (290€)

Nuovi Prodotti

Tender - BTP Multi-Supplier Offer Comparator

mp20126d20260429115451

Multi-supplier offer comparator for construction. Built-in Swiss CFC dictionary, signable Budget PDF, full workflow.

149,00 €
Al netto delle imposte

  • Autore START solutions
  • Versione modulo 2.3.14
  • Rilascio data 29/04/2026
  • Accesso agli aggiornamenti e ai download 1 anno
  • Come contattare l'assistenza start@vuillety.ch
  • Compatibilità Dolibarr V22+   -   PHP8.0 - 8.5
  • Ultimo aggiornamento 07/05/2026 11.42

Maggiori informazioni...

Premium module for managing tenders and supplier offer comparisons in construction. Designed for real estate experts, property managers, architects and engineering offices.

═══ MAIN FEATURES ═══

▸ MULTI-SUPPLIER OFFER COMPARATOR
For each project, structure your works into line items by trade and collect multiple supplier proposals per item. Cross-table view: suppliers in columns, items in rows. Lowest-bid highlighting, variance percentage calculation, radio selection of retained proposal, automatic "if everything from this supplier" total per column, real-time selected Net total.

▸ BUILT-IN SWISS CFC DICTIONARY
65 standard codes following SN 506 500 / CRB / SIA standards, covering chapters 1 (Preparatory works), 2 (Building), 3 (Operating equipment), 4 (External works), 5 (Secondary costs) and 9 (Furnishings and decoration). Smart autocomplete on the line item form: type "271" → suggests "Plastering"; type "paint" → suggests paint codes. Search by code (prefix) or label (contains).

▸ DICTIONARY ADMIN PAGE
Add your custom codes, disable unused ones, modify labels. Anti-deletion safeguard for codes already in use.

▸ BUDGET PDF GENERATION
Professional 2-page PDF:
- Page 1: logo + slogan, client/building/rent block, description, full financial summary (subtotal, VAT, fees, contingencies, total incl. tax), enriched legal mention, signature block with pre-filled Owner + Date / First name / Last name / Signature.
- Page 2: complete table of items/proposals, retained selections highlighted (green background), warning if no selection made, totals area re-displayed.

▸ WORKFLOW AND TRACEABILITY
Lifecycle: Draft → Receiving → Compared → Decided → Archived. Granular rollback: possibility to revert from Decided to Compared to adjust selections, or from Compared to Receiving to reopen the collection phase.

▸ NATIVE DOLIBARR INTEGRATION
- Configurable automatic numbering (default model SOyymm-NNNN)
- Link to Third Party (Project Owner) and to Project
- Link to Dolibarr suppliers or free text entry for exploratory offers
- Automatic registration in the ECM tree (DMS)
- Automatic copy of generated PDFs to documents/societe/{id}/SOUMISSION/
- Customizable triggers via standard Dolibarr interface

▸ CONFIGURATION
- Numbering model
- Supplier VAT rate (default 8.10% Swiss, configurable)
- Management fee rate
- "Contingencies" reserve rate
- Default validity period
- Company logo upload
- Customizable slogan displayed under the logo

═══ USE CASES ═══

▸ Property management / Co-ownership: preparation of renovation budgets submitted to general assemblies with clear CFC breakdown and pricing justified by received offers.

▸ Engineering office / Architect: post-tender offer comparison for award decision support.

▸ Real estate expert / Project manager: establishment of the "Construction Budget" signed by the Owner before works start.

▸ General contractor / Pilot: consolidated tracking of multiple lots with intra-lot comparison and CFC synthesis.

═══ COMPATIBILITY ═══

- Dolibarr 22.0 → 23.x (tested up to v23.0.2)
- PHP 7.4+ (PHP 8.0+ supported)
- MariaDB / MySQL with InnoDB
- Multi-company: yes

═══ INSTALLATION ═══

1. Download the module ZIP
2. Unzip into htdocs/custom/ of your installation
3. Setup > Modules > Tenders > Activate
4. Configure via the "Configure" button
5. The CFC dictionary is populated automatically

═══ SUPPORT ═══

Publisher: START solutions Sàrl, Geneva (Switzerland)
Contact: start@vuillety.ch
Website: https://vuillety.ch

For custom development (additional fields, specific integrations, custom PDF templates), please contact us.

═══ LICENSE ═══

GPL v3 or later.




If you think this module is a fork of another one (published after the first one) or violates some terms or conditions of use (for users or vendors), you can make a report at dolistore@dolibarr.org