Nessun prodotto
* I prezzi possono variare a seconda del Paese.
* Al momento del pagamento è possibile aggiungere un contributo aggiuntivo.
Nuovi Prodotti
Sollecita in modo efficace le fatture non pagate dei tuoi clienti in Dolibarr: livelli di sollecito configurabili, lettere di sollecito stampate in un unico PDF, email di sollecito con la tabella delle fatture, azioni manuali per i tuoi addetti al recupero crediti e una cronologia completa su ogni cliente. Porting fedele del modulo Odoo «Customer Payment Follow-up Management».
Connect Dolibarr to your Billit account, a French Approved Platform and Peppol access point. Invoices and credit notes go to Billit in one click, in bulk or on validation. Totals are checked before sending, statuses come back on their own, supplier invoices arrive as drafts. Billit subscription required.
mp25264d20261004023132
Nuovo
Professional Change Control module for Dolibarr with Impact Assessment, Risk Assessment, Approval Workflow, Implementation Action Plan, Effectiveness Check, Audit Trail and PDF reporting.
|
|
Change Control Pro provides a structured and traceable Change Control workflow directly inside Dolibarr.
Manage the complete lifecycle of a change request from creation and assessment through approval, implementation, effectiveness verification and controlled closure.
Main features
• Automatic Change Request references (CHG-YYYY-####)
• Change Request creation, ownership, priority and target dates
• Multiple Impact Assessment items
• Impact categories for documents/SOPs, products, specifications, equipment, suppliers, training, CAPA/deviations, software and other items
• Risk Assessment with Severity, Probability and optional Detectability
• Automatic risk score and Low / Medium / High / Critical classification
• Approval Workflow with Approve / Reject decisions and approval history
• Implementation / Action Plan with responsible users, due dates, evidence and progress tracking
• Effectiveness Check before controlled closure
• Automatic read-only Audit Trail
• Previous and new values recorded for key modifications
• Complete downloadable PDF Change Control report
• Responsive interface for desktop, tablet and mobile
• English and Romanian translations
Workflow
Draft → Impact Assessment → Risk Assessment → Pending Approval → Approved → Implementation → Effectiveness Check → Closed
A change can only be closed after an Effective Effectiveness Check.
Auditability
Important workflow actions are automatically recorded in the Audit Trail, including the user, date/time, object, event details and previous/new values where applicable.
PDF reporting
Generate a complete Change Control dossier containing general information, Impact Assessment, Risk Assessment, Approval History, Implementation actions, Effectiveness Check and Audit Trail.
Compatibility
Dolibarr 23.0+
PHP 7.4+
Change Control Pro is designed for organizations that require structured change management, accountability and complete traceability inside Dolibarr.