Promozioni

  • Advanced HRM : Advanced human resources management

    This module brings a layer of ergonomics and features missing in the standard Dolibarr human resources management module, such as the facility to create absence requests from the employee schedule, the addition of automatic VAT rates, the integration of the km scale on the tranche 1 and of google maps.

    145,00 €  (348€)
  • MBI Yousign - Youtrust firma certificata eIDAS

    Il modulo MBI Signature Yousign - Youtrust consente ai tuoi clienti di firmare preventivi, ordini, contratti, mandati SEPA, interventi e bolle di consegna tramite Yousign, nonché documenti esterni allegati e file esterni. La firma certificata eIDAS include un codice SMS per verificare l'identità del firmatario.

    16,625 €  (39€)

Nuovi Prodotti

  • EasyFleet - Gestione della flotta in Dolibarr

    Veicoli, scadenze, carburante, spese, pneumatici, costi, incidenti e app del conducente, tutto in Dolibarr.

    290,00 €
  • Ultimatelingua 24.0

    Imparate tedesco, inglese e spagnolo in Dolibarr con brevi lezioni nello stile delle app di lingue: scelta multipla, traduzione, parole in ordine e abbinamenti, con pronuncia, punti, serie, medaglie e classifica settimanale. 18 corsi da A1 a C2 inclusi, per francofoni.

    120,00 €

Sync Spent Time to External Calendar Events

mp1690d20250629024414

Synchronizes intervention lines and project's task time to external private calendar event.

120,00 €
Al netto delle imposte

  • Autore de Grandpré Technologies
  • Versione modulo 1.1
  • Rilascio data 29/06/2025
  • Accesso agli aggiornamenti e ai download 1 anno
  • Come contattare l'assistenza info@de-grandpre.quebec
  • Compatibilità Dolibarr V19+
  • Ultimo aggiornamento 21/07/2026 22.53

Maggiori informazioni...

Intervention and TaskTime CalDAV Sync

Synchronizes intervention lines and project's task time to external private calendar event. 

This module is intended to use with external CalDAV serveur, like NextCloud Calendar.

It create and update events in calendar when Dolibarr Intervention objects are validated. When event changes on external CalDAV server, interventions lines are updated, manually ou automatically with a cron job (recurring task).

When used with interventions generated from project task time, task time will also be updated, allowing for invoicing time based on calendar data. This functionnality works only on Dolibarr version 22 and over.

== Installation ==

The distribution file contains a module (DgLibPub) that shall be installed before installing this module.
DgLibPub is used to validate the Dolistore purchase code ans must be install first.

To do so, you must first extrant the DgLibPub module from the archive, then install it in Dolibarr.
That module fikle is under the doc/ folder in the archive.

== Documentation == 

See provided documentaiton in distribution package for detailed instructions on configuration and usage.




If you think this module is a fork of another one (published after the first one) or violates some terms or conditions of use (for users or vendors), you can make a report at dolistore@dolibarr.org