Sin productos
* Los precios pueden variar dependiendo de su país.
* Se puede añadir un aporte adicional al momento del pago.
Nuevos productos
For Swiss banking workflows, turn CAMT statements into Dolibarr transactions: match payments, create a missing customer or supplier invoice from the bank line, and prepare PAIN.001 supplier payments.
Gestione todo el ciclo de formación de sus empleados en Dolibarr: solicitud de formación, aprobación por el responsable y el responsable de formación, generación de las formaciones de empleados, planificación en sus centros y aulas, formadores, tareas de proyecto, evaluación y certificados. Un proceso claro, trazable y totalmente integrado con sus usuarios, grupos y proyectos.
mp25264d20261004023132
Nuevo
Professional Change Control module for Dolibarr with Impact Assessment, Risk Assessment, Approval Workflow, Implementation Action Plan, Effectiveness Check, Audit Trail and PDF reporting.
|
|
Change Control Pro provides a structured and traceable Change Control workflow directly inside Dolibarr.
Manage the complete lifecycle of a change request from creation and assessment through approval, implementation, effectiveness verification and controlled closure.
Main features
• Automatic Change Request references (CHG-YYYY-####)
• Change Request creation, ownership, priority and target dates
• Multiple Impact Assessment items
• Impact categories for documents/SOPs, products, specifications, equipment, suppliers, training, CAPA/deviations, software and other items
• Risk Assessment with Severity, Probability and optional Detectability
• Automatic risk score and Low / Medium / High / Critical classification
• Approval Workflow with Approve / Reject decisions and approval history
• Implementation / Action Plan with responsible users, due dates, evidence and progress tracking
• Effectiveness Check before controlled closure
• Automatic read-only Audit Trail
• Previous and new values recorded for key modifications
• Complete downloadable PDF Change Control report
• Responsive interface for desktop, tablet and mobile
• English and Romanian translations
Workflow
Draft → Impact Assessment → Risk Assessment → Pending Approval → Approved → Implementation → Effectiveness Check → Closed
A change can only be closed after an Effective Effectiveness Check.
Auditability
Important workflow actions are automatically recorded in the Audit Trail, including the user, date/time, object, event details and previous/new values where applicable.
PDF reporting
Generate a complete Change Control dossier containing general information, Impact Assessment, Risk Assessment, Approval History, Implementation actions, Effectiveness Check and Audit Trail.
Compatibility
Dolibarr 23.0+
PHP 7.4+
Change Control Pro is designed for organizations that require structured change management, accountability and complete traceability inside Dolibarr.