Promotions

  • Comprehensive Bidding System for Dolibarr

    Manage the whole life cycle of your government and private sector tenders, from the tender notice to the award: a complete bid file, detailed cost estimation, document management, work location on Google Maps, weighted evaluation and project creation in one click.

    125.00 €  (250€)
  • Advanced HRM : Advanced human resources management

    This module brings a layer of ergonomics and additional features in the standard Dolibarr human resources management module, such as the facility to create absence requests from the employee schedule, the addition of automatic VAT rates, the integration of the km scale on the tranche 1 and of google maps.

    145.00 €  (348€)

New products

  • BeezCRM

    A complete sales pipeline for Dolibarr. Track deals through configurable stages and proposals, plan next steps in the agenda, and run follow-up outreach, with no core patch and no extrafields.

    FREE
  • Ultimatelingua 24.0

    Learn German, English and Spanish in Dolibarr with short lessons in the style of the language apps: multiple choice, translation, words in order and matching pairs, with pronunciation, XP, streaks, medals and a weekly ranking. 18 courses from A1 to C2 included, for French speakers.

    120.00 €

Third parties Processing

mp1395d20260116090053

This module allows you to manage material flow and inventory in situations such as processing or repairing materials at third-party locations. It allows for material shipments and returns, linking the latter to the former. The result is traceability of movements and inventory at the material subcontractor.

110.00 €
Excl. tax

  • Author OPG
  • Module version 1.0
  • Release date 01/16/2026
  • Access to download and updates 1 year
  • How to contact support mailto:info@opigi.com
  • Compatibility Dolibarr V23+
  • Last update 03/10/2026 09:51 AM

More info...

OPG

Component part of the DOLYWM – ECOSYSTEM project, this module allows you to manage the flow of materials and inventory in situations such as processing or repairing materials at third-party locations.
It consists of two phases:

  • Upon shipment, new inventory at the third-party location is tracked.
  • Upon return, the material can be deducted from previous shipments.

The result is traceability of material movements and inventory at the third-party location.
Requires the “Advanced Warehouse Management” and “Advanced Shipments” modules.

 

User interface language:

:English Français Español Italiano

Our other related products:

     

 




If you think this module is a fork of another one (published after the first one) or violates some terms or conditions of use (for users or vendors), you can make a report at dolistore@dolibarr.org