No products
* Prices may vary depending on your country.
* An additional contribution can be added at the time of payment.
New products
mp23914d20260319105526
Create project tasks directly from proposal, customer order and invoice lines. Each line can be linked to a different project using Dolibarr native selectors, with display in document view and PDF.
|
|
From a proposal, an order or an invoice, each line becomes a project task in one click: with its project, its reference and its owner.
|
1
click per line
|
Per line
or one global project for all
|
PDF
with the project and task reference
|
V16 – V24
PHP 7.4 – 8.3+
|
The proposal is approved and work starts, but project tasks are created by hand. The concept is copied, the project is looked up, the reference is typed and someone is assigned. In that move, which line created which task is lost and the project stops matching what was sold.
If the line already says what must be done, the task should not start by copying it.
Assign each line to its project or apply one common project to all selected. The task is created with the numbering module's reference and the current user as assignee, and the line shows the linked project and task.
| Dolibarr | V16 – V24 |
| PHP | PHP 7.4 – 8.3+ |
| Base de datos | MySQL 5.7+ · MariaDB 10.2+ · PostgreSQL 10+ |
| Actualizaciones | 365 días de acceso a actualizaciones |
The module is maintained on Dolibarr V16–V24 with the native project selector, automatic reference and PDF view reviewed in recent versions.
|
24
módulos publicados en Dolistore
|
100 %
código fuente completo
|
8
idiomas en la interfaz
|
365
días de actualizaciones
|
Cuéntanos tu caso y te decimos si EasyLineToTask te sirve — y si no, te lo decimos igual.
info@easysoft.es www.easysoft.es