Promotions

New products

  • Change Invoice Reference

    Instantly modify the reference of your draft invoices in one click, without any SQL manipulation or risk of error. A simple button on your invoice cards allows you to quickly and safely change the reference of a draft invoice, directly from the Dolibarr interface.

    19.00 €
  • HR Contracts and Alerts

    HR Contracts and Alerts is a complete human resources module for Dolibarr designed to manage employee contracts, monitor contract lifecycles, and automatically alert HR managers before contract expiration.

    100.00 €

InfraSProject

c5201d20230928103257

Advanced InfraS project management allows - Display of provisional profit (summary table of projects) - Adding stock items to the project and integrating their cost. - The possible link between consumption and users (PPE, tools). - A possible analysis per month, per user of costs. - The distribution of supplier invoice lines on different projects/sites.

50.00 € Excl. tax

  • Author Sylvain Legrand
  • Module version 18.7.6
  • Release date 09/28/2023
  • Access to download and updates 1 year
  • How to contact support mail to support@infras.fr
  • Compatibility Dolibarr V18+   -   PHP7.4 - 8.2
  • Last update 01/06/2026 12:41 PM

More info...

InfraS.fr
InfraSProject
  Detailed description Advanced InfraS project management brings numerous improvements to Dolibarr's basic functions:
 
  • An improved project summary table (overview):
    • Display of provisional profit => Total signed quotes - (total supplier orders + total supplier invoices not linked to an order + total desired cost types + total supplier invoice overruns) (optional display)
    • Display of the balance to be paid for supplier orders
    • Display of the balance to be invoiced for signed quotes
    • Display of stock consumption
    • Ability to hide empty detail tables (optional display)
  • Addition of company stock items to the project (Stock consumption).
  • Integration of stock consumption costs into the project (site) cost.
  • Possible link between stock consumption and users (e.g.: withdrawal of PPE, tools, etc.).
  • Analysis possible by month, by consumer (user) of costs.
  • Allocation of supplier invoice lines to different projects/sites.
  • Addition of supplier invoice lines to the list of project expenses.
 
  Languages English English  / Spanish Spanish  / French French
  Installation
Download the module archive file (.zip) from the dolistore.com website
Install our modules from the "Install/Deploy a module" tab found on the modules page.
The module can then:
 
  • be activated (Switch Off => Switch On)
  • configured (Setup) if needed (from the module configuration page)
  • and finally used
 
  Resources
Forum ( French FR )
Demo site ( French FR )
 
  • Login: Demo / Password: Demo
 

 

OTHER MODULES MIGHT INTEREST YOU

InfraSPackPlus
InfraS model pack with advanced features for Dolibarr.
InfraSSearch
Advanced InfraS search for Dolibarr.
InfraSSecureIban
IBAN validation management in your business management.
InfraSMultiDiscount
Discount entry for Dolibarr.
InfraSWorkflow
Advanced management of InfraS inter-module flows for Dolibarr.
InfraSPointages
Employee time tracking management for Dolibarr
InfraSWidgets
Advanced widgets for Dolibarr.
InfraSReports
Advanced reports for Dolibarr.
InfraSSupPrice
Supplier price management for Dolibarr.
   
  InfraSTechInfos  
  Technical summary of commercial documents for Dolibarr.  
  More  
 
  InfraSCusPrice  
  Customer price management for Dolibarr.  
  More  
 



If you think this module is a fork of another one (published after the first one) or violates some terms or conditions of use (for users or vendors), you can make a report at dolistore@dolibarr.org